Coil condenser replacement for client in the South of England

Our London-based engineering teams recently completed condenser coil replacements on two York chillers during a 4-5 week turnaround that included occasional Saturday crane lifts.

Crane was utilised over two weekends to get coils in place and to remove the old ones from the roof.

Engineers Andy Thiselton and Jeff Porter led the project, with assistance from Darren Hemmett, Roy Perris, Alex Robinson, Daniel Lake and Jay Labram.


  • Condenser coil replacement for client

  • York chillers

  • 4-5 week turnaround

  • One chiller kept operational throughout works

  • Crane hired to lift old coils off rooftop and to help lift new coils to replace them

  • Project cost approx. £115,000


One chiller remained operational throughout the works which meant the coils were replaced on one chiller before the team moved on to the second.

Client left extremely happy with the end result and system is now fully operational