Projects
-
Carried out a phased replacement of Airedale BluCube DX units serving AHU3
Phased replacement of two end of life Airedale BluCube DX units for Daikin ERQ250AW1 Condensers on AHU3 for a private client, including new EKEXV valves and EKEQFCBA control boards.
-
Klimatec recently installed three 14kw split A/C systems for a private client in London
Following a site survey where the engineer deemed there to be insufficient cooling, Klimatec was drafted in to install three splits A/C systems to improve airflow and provide cooling to critical equipment.
-
Critical remedial works including installing two splits for a private client in London
Klimatec replaced two splits as part of critical remedial works following a recent survey visit of the basement rectifier room. Reports of multiple issues with the systems from a prior botched install.
-
Klimatec recently provided cooling solutions for a home building client HQ
Installed new VRV equipment throughout offices & provided space saving solutions that provide efficiency-boosting results for a private home building client in Cambridge.
-
Coil condenser replacement for client in the South of England
Our London-based engineering teams recently completed condenser coil replacements on two York chillers during a 4-5 week turnaround that included occasional Saturday crane lifts.
-
Klimatec replaces end of life air cooled chiller for private client in Surrey
We removed the end of life chiller for a private client in Surrey and replaced it with a Carrier 30RBP410-R 405kW air cooled system which suited the available space on the client’s rooftop using a crane lift.
-
Klimatec's Midlands team recently replaced two York air cooled chillers
The team recently replaced two York YAES 0565 BSA air cooled chillers with Daikin energy efficient inverter EWAD 570TZ-SS-B2 screw chillers, including decommissioning & commissioning services, for a private treatment facility.
-
Nail biting install of double regulation valve got pulses racing
120,000 litres of chilled water running through a bypass which had to be frozen and then cut, above a live data centre which had to remain operational. Sound stressful? Just ask Operations Director Ben!
-
Install to existing chilled water system for client in the south of England
Klimatec decommissioned and repositioned an existing McQuay chiller, as well as installed a buffer vessel to support an existing Parker Hirros chiller which was piped directly into the building, including new pump sets.
-
x2 split air conditioning installation to provide a heating and cooling solution
Klimatec was asked to visit a site in east London to survey a private premises which had no heating or cooling. The previous contractor installed a Losnay unit which only provided fresh air and extract.
-
Replaced evaporator, compressor and oil separator for a private client
Klimatec was asked to replace a failed evaporator and compressor for a client in the South of England. The client’s evaporator tubes were leaking across to the refrigerant side so it was critical they were replaced.
-
Private client requested an AHU modification for 68kW DX cooling
We were asked to retrofit several 10 year old fresh-air-only air handling units that served two of their critical uninterrupted power supply rooms. We were only allowed to turn one of the four units off at a time.
-
900kW air-cooled chiller replacements for a client based in Islington, London
We supplied two 900kW Mitsubishi air-cooled chillers over two phases. Our projects team ran and managed seven subcontractors throughout the project, which also involved working with Ainscough’s heavy crane division.
-
x3 1.2mW water-cooled chiller replacements for a client in London
Working alongside six project partners and nine subcontractors, we successfully replaced three 1.2mW Carrier water-cooled chillers under challenging traversal and spatial conditions.