Projects

  • Carried out a phased replacement of Airedale BluCube DX units serving AHU3

    Carried out a phased replacement of Airedale BluCube DX units serving AHU3

    Phased replacement of two end of life Airedale BluCube DX units for Daikin ERQ250AW1 Condensers on AHU3 for a private client, including new EKEXV valves and EKEQFCBA control boards.

  • Klimatec recently installed three 14kw split A/C systems for a private client in London

    Klimatec recently installed three 14kw split A/C systems for a private client in London

    Following a site survey where the engineer deemed there to be insufficient cooling, Klimatec was drafted in to install three splits A/C systems to improve airflow and provide cooling to critical equipment.

  • Critical remedial works including installing two splits for a private client in London

    Klimatec replaced two splits as part of critical remedial works following a recent survey visit of the basement rectifier room. Reports of multiple issues with the systems from a prior botched install.

  • Klimatec recently provided cooling solutions for a home building client HQ

    Klimatec recently provided cooling solutions for a home building client HQ

    Installed new VRV equipment throughout offices & provided space saving solutions that provide efficiency-boosting results for a private home building client in Cambridge.

  • Coil condenser replacement for client in the South of England

    Coil condenser replacement for client in the South of England

    Our London-based engineering teams recently completed condenser coil replacements on two York chillers during a 4-5 week turnaround that included occasional Saturday crane lifts.

  • Klimatec replaces end of life air cooled chiller for private client in Surrey

    Klimatec replaces end of life air cooled chiller for private client in Surrey

    We removed the end of life chiller for a private client in Surrey and replaced it with a Carrier 30RBP410-R 405kW air cooled system which suited the available space on the client’s rooftop using a crane lift.

  • Klimatec's Midlands team recently replaced two York air cooled chillers

    The team recently replaced two York YAES 0565 BSA air cooled chillers with Daikin energy efficient inverter EWAD 570TZ-SS-B2 screw chillers, including decommissioning & commissioning services, for a private treatment facility.

  • Nail biting install of double regulation valve got pulses racing 

    120,000 litres of chilled water running through a bypass which had to be frozen and then cut, above a live data centre which had to remain operational. Sound stressful? Just ask Operations Director Ben!

  • Install to existing chilled water system for client in the south of England

    Install to existing chilled water system for client in the south of England

    Klimatec decommissioned and repositioned an existing McQuay chiller, as well as installed a buffer vessel to support an existing Parker Hirros chiller which was piped directly into the building, including new pump sets.

  • x2 split air conditioning installation to provide a heating and cooling solution for a private client in London

    x2 split air conditioning installation to provide a heating and cooling solution

    Klimatec was asked to visit a site in east London to survey a private premises which had no heating or cooling. The previous contractor installed a Losnay unit which only provided fresh air and extract.

  • Replaced evaporator, compressor and oil separator for a private client

    Klimatec was asked to replace a failed evaporator and compressor for a client in the South of England. The client’s evaporator tubes were leaking across to the refrigerant side so it was critical they were replaced.

  • Private client requested an AHU modification for 68kW DX cooling

    Private client requested an AHU modification for 68kW DX cooling

    We were asked to retrofit several 10 year old fresh-air-only air handling units that served two of their critical uninterrupted power supply rooms. We were only allowed to turn one of the four units off at a time.

  • 900kW air-cooled chiller replacements for a client based in Islington, London

    900kW air-cooled chiller replacements for a client based in Islington, London

    We supplied two 900kW Mitsubishi air-cooled chillers over two phases. Our projects team ran and managed seven subcontractors throughout the project, which also involved working with Ainscough’s heavy crane division.

  • x3 1.2mW water-cooled chiller replacements for a client in London

    x3 1.2mW water-cooled chiller replacements for a client in London

    Working alongside six project partners and nine subcontractors, we successfully replaced three 1.2mW Carrier water-cooled chillers under challenging traversal and spatial conditions.